Bathroom renovation, strip-out to finish
Old shower hob and tiles demolished back to the slab, walls stripped, then retiled floor to ceiling in dark marble-look tiles, finished with black tapware and a frameless glass shower.
Circle Contracting / Projects
A selection of jobs we've carried out, taken from our own quotes, invoices, timesheets and site photos. Client names and street addresses are left out. Suburbs and years are real.
Old shower hob and tiles demolished back to the slab, walls stripped, then retiled floor to ceiling in dark marble-look tiles, finished with black tapware and a frameless glass shower.
Fixtures, shower screen, toilet and benchtops stripped out, the old shower step and tiles demolished, then new tiles to the wet-area walls and floors and the adjoining dry floor. Tiled skirting, doors trimmed to the new floor height, and mitred edges. The job grew to include both toilets, upstairs and down.
600 × 600 tiles to the walls and floor, two coats of waterproofing membrane, a water stop at the shower, and tiles supplied and delivered by us.
A second bathroom tiled for a renovation builder, plus demolition, floor repours and a concrete pour to close a gap at a living-room window.
Small 47 × 145 Spanish ceramic tiles laid in herringbone, with matching 300 × 300 wall tiles, supplied, grouted and sealed by us.
Surface prep and a pool waterproofing system, then tiling to the walls, steps and bench, with epoxy grout and a mosaic feature.
Floor set out to a laser line over the old terrazzo, then laid in grey large-format tiles with darker inset areas, including at the entry.
A timber-framed mezzanine platform, sheeted, with steel-stud office walls built on top and lined in plasterboard.
Stud walls and a bulkhead continued through the unit, framing and hardware for glass partition panels and two glass doors, and internal batten cladding glued to the walls.
Carpenters and labourers supplied to a renovation builder across several sites for weeks at a time: fit-off, skirting, door hardware, mirrors, ceilings, a timber bench and shelving, and the handover fixes before the keys went back.
Two carpenters over three weeks, sheeting and flushing plasterboard, invoiced weekly against signed timesheets.
An L-shaped outdoor bar framed in timber under a patio roof, with the benchtops set on the frame.
Carpentry in managed properties, billed by the hour with the dates on the invoice, and materials passed on at cost with the receipts attached.
A trades assistant on site for a week of long shifts, invoiced day by day.
We also price whole-house tiling for home builders, including wet areas with screeds and niches and large-format rectified tiles through living areas and alfresco, as well as decks, eaves and custom joinery like walk-in robes, scullery units and alfresco cabinets. Ask us about any of these.