Strip-out to finish
Old hob and tiles demolished, then retiled floor to ceiling in dark marble-look tiles, with black tapware and a frameless glass shower.
Bathroom renovations
A bathroom is the room most likely to go wrong and the most expensive to redo. We take it from the old tiles coming off to the last line of silicone, with one point of contact the whole way through.
A full renovation
Old tiles, screed, vanity, shower screen and fittings removed and taken away. The house is protected and the dust kept to the bathroom.
New pipes, wastes and wiring where they need to move, by licensed partner plumbers and electricians. We organise them, so you don't chase three trades.
The floor is shaped so water runs to the waste. NCC 2022 allows a shower fall of 1:80 to 1:50, and we check it with a level before anything goes on top.
Primer, bond breakers at every junction, puddle flanges at the wastes, a water stop at the doorway, then two coats of a Class III membrane, left to cure fully.
Set out to a plan you've seen. Walls, floor, niches, hobs and steps, with mitred corners or trims on every external edge.
Grout colour chosen with you. Flexible sealant, not grout, in the corners and around the bath and shower.
Vanity, mirror, doors and hardware fitted by our carpenters; plumbing and electrical fit-off by the licensed trades.
The room cleaned, the rubbish gone, and a walk-through with you before we call it finished.
How each step is done is on Our standards
Before and after
The same bathroom, before and after.


What it costs
We're not the cheapest quote you'll get, and we don't try to be.
Proper screeds, a membrane that's allowed to cure, back-buttered tiles and straight silicone all take time and better materials. That's where the difference in price goes, and it's why the job doesn't need doing again in five years.
What you get in return is an itemised quote, and no surprises. If something changes once the old tiles are off, we tell you and agree it before it's done.


Recent bathrooms






Also in a renovation
Herringbone, terrazzo-look, mosaics and large slabs with a strong vein. Where the pattern starts and where the cuts land are worked out before the first tile goes down, and small formats are priced on their own line.
Kitchen and laundry splashbacks with the cuts around power points planned, grout lines lined up with the benchtop, and flexible sealant where tile meets bench.
Living areas, hallways, kitchens and alfresco, mostly in large format. We check the floor before we quote, so levelling is in the price, not a surprise halfway through.
Related projects
Old hob and tiles demolished, then retiled floor to ceiling in dark marble-look tiles, with black tapware and a frameless glass shower.
Fixtures and the old shower step out, new tiles to the wet-area walls and floors and the adjoining dry floor, tiled skirting, doors trimmed and mitred edges. The job grew to include both toilets.
600 × 600 tiles to the walls and floor, two coats of waterproofing membrane, a water stop at the shower, and tiles supplied and delivered by us.
Questions
Cure times set the pace more than the tiling does: the screed and the membrane each need to dry before anything goes on top, and the plumber and electrician fit in around them. You'll get a start date and an expected finish with the quote, and we'll tell you straight away if something on site changes that.
Licensed partner plumbers and electricians. We book them in around our work and they're on the same quote, so you have one point of contact for the whole room.
Yes. We photograph the membrane before it's covered, and you're welcome to see it on site. How we waterproof.
Yes. If a builder or your own plumber is handling the rest, we'll screed, waterproof and tile, and leave it ready for their fit-off.
Send a few photos of the room and your suburb. We'll come and look for free, talk through what you want, and give you an itemised quote.